BG wins FPSO upper module and integrated system contract

Recently, it was learned that BG Group and its partners recently won six FPSO upper module and integrated system package contracts valued at USD 4.5 billion. These FPSOs will be deployed in the BM-S-9 and BM-S-11 areas under the salt deposits in Santos Bay, Brazil. Piece.
It is also reported that BG Group will receive the contract of the other two FPSO upper modules and integrated system packages in the next 18 months.

Timing Sprocket

Timing Sprocket,Timing Belt Pulley ,Drive Belt Pulley ,Aluminum Timing Belt Pulleys

Agricultural Machinery Parts Co., Ltd. , http://www.nboilpump.com

Posted on