Jing Shi Commercial Plaza (Phase II) Construction Project

Project Name: Jingshi Commercial Plaza (Phase II) Construction Project Area: Guangdong Progress Period: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Building Materials, Exterior Wall Decoration Materials, Door and Window Glass, Sanitary Ware, Elevators, Cranes, Cranes, Excavators, Waterproof and Anticorrosion Materials, Paint Coatings, Valve Components, Ceramic Products, Instrumentation, Water Supply and Drainage Systems, Pipe Fittings, Water Supply Equipment, Outdoor Drainage, Building Electrical, Lighting Fixtures, Low Voltage Electrical Appliances, Wire and Cable, Weak Current Systems , Lightning system, low voltage distribution cabinet, steel structure. (for reference only)
Project Profile: The project is located north of Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou (east side of Grand Hyatt Huajing Hotel), with a planned construction area of ​​4,3944.7m2 and a total construction area of ​​132,821m2. It is planned to build 2 commercial buildings and 12 floors above ground. , The building area is 90833m2. The total investment of the project is 139.46 million yuan.
Construction Unit: Guangzhou Jing Shi Tian Entertainment Investment Co., Ltd. Postal address: Shop 1.3, Building A, No.15, No.15, Xindu Avenue, Xinhua, Huadu District, Guangzhou 5100000, China Contact Person: Huang Weijun Telephone Design Unit: Guangdong Institute of Ecological Environment and Soil Science (EIA)
Postal address: No. 808, Tianyuan Road, Tianhe District, Guangzhou, China Postal Code: 500000
Contact: Lin Changyong Telephone
Related Developments: Tower Crane Infrastructure Project

Spiral Classfier

Ore Dressing Machine, Feeder ,Mineral Separator,Mining Mill

Crushing Equipment,Mobile Crusher Co., Ltd. , http://www.nbgrindingequipment.com

Posted on